top of page
Bartley-Junction-Header-3000px.jpg

A NEW INDUSTRIAL / WAREHOUSE DEVELOPMENT

Bartley-Junction-CGI-5.jpg

UNITS FROM 9,935 TO 20,559 SQ FT

Bartley-Junction-Section-Bkg-1.jpg

OVERVIEW & SPECIFICATION

The 11-unit scheme will be developed to a highly sustainable specification, with a target EPC Rating of ‘A+’ and BREEAM ‘Excellent’. Clear internal heights range from 8.5m – 10.5m with excellent loading door provision and fully fitted first floor office accommodation.

The scheme will be speculatively developed, with anticipated completion May 2025.

CONSTRUCTION VIDEO & GALLERY UPDATE – FEBRUARY 2025

Tint-Bkg.jpg
Icon10.png

Target BREEAM ‘Excellent’

Icon1.png

8.5m – 10.5m clear internal heights

icon-epcaplus.png

Target EPC ‘A’+

Icon2.png

1:6,572 sq ft loading door ratio

Icon6.png

EV charging points

Icon4.png

16.5m – 27m
yard depth

Icon8.png

Rooftop
solar PV

Icon5.png

VRF air conditioning
to offices

Icon3.png

3 phase

1.1MVA

Icon7.png

1:676 sq ft car parking ratio

Bartley-Junction-CGI-6.jpg
Scheme.jpg
Table-v2.png
Bartley-Junction-Section-Bkg-2.jpg

LOCATION

Bartley Junction is strategically located less than 1 mile from Junction 5 of the M3 motorway, accessed via the B3349. The site is highly prominent and provides easy access to key surrounding towns such as Basingstoke, Reading, Farnborough, Bracknell and Guildford. Hook Railway Station is within a 10 minute walk, providing direct access to London Waterloo (1 hr 5 mins). Within a 30 minute travel time there is an employable workforce of 1.1m people. 

Local occupiers include DFS, Cosentino, Screwfix and Howdens. Tesco, Sainsbury’s and other retail offerings (cafe, post office, restaurants and shops), together with 2 petrol filling stations, are within walking distance.

Bartley-Junction-CGI-2.jpg

BROCHURE DOWNLOAD

brochure-download.jpg
bottom of page